Categories
Contact Us

Shijiazhuang Hongdefa Machinery Co.,Ltd

Address:No.388 Jianhua North Street,Shijiazhuang,China.

Manager:Rita Guo


Sale: Kelly Ren

E-mail:vanisa@vip.126.com

Cell:+8615533926058 (whatsapp)  Contact me freely!


Fax:0086-311-87910068

Service Hotline
+86-138-33461840
(whatsapp/Viber)
Sudan Maize Roller Mill 50T Per 24h

Sudan Maize Roller Mill 50T Per 24h

Shijiazhuang Hongdefa Machinery Co.,Ltd is one of the best China sudan maize roller mill 50t per 24h manufacturers, with advanced factory, we are also a professional Africa sudan maize roller mill 50t per 24h, maize flour mill machine, maize hammer mill supplier. Sudan Maize roller mill 50T/24h...

Product Details

Shijiazhuang Hongdefa Machinery Co.,Ltd is one of the best China sudan maize roller mill 50t per 24h manufacturers, with advanced factory, we are also a professional Africa sudan maize roller mill 50t per 24h, maize flour mill machine, maize hammer mill supplier.

Sudan Maize roller mill 50T/24h

1.What is the capacity?
QA: processing 50 tons of maize per 24 hours

2.What is the control system? 

QA: PLC control system with touch screen . More advanced


















3.How about the final products ?
Maize samp/maize grits/maize meal/maize flour/bran for making ugali, fufu, sadza, snacks, etc.

 

Sudan Maize Roller Mill 50T Per 24h Technical Parameters:

TECHNICAL DATA :

1. Capacity: 50 ton maize per 24 hours

2. Products variety: 1) Maize fine flour, all through 44 mesh (400micron) sieve

                                     2) Maize rice;

                                     3) Maize germ;

                                     4) Maize bran;

                                     5) Coarse fodder.

3. Extraction rate: 1)Fine Maize flour: 30~40%

                                2)  Maize rice: 35-40%

                                3)Maize germ: 8-10%

                                4) Maize bran and Fodder flour: 10-14%

4. Workshop dimension: 33×12×6m (L×W×H)

5. Power supply: About 147kW.

6. Total weight of the equipment: 30T.

7. Container: 2*40’+20 ’(common one suit for transportation).

8. Installing time: Two  months.

 



Kenya clients make order

 


Related Products
Feedback